and emergency treatment measures.
(4) Unit unit (furnace mechanical and electrical) to achieve full CRT monitoring.
4 Requirements for DCS software and hardware
In order to better explain the electrical DCS into the software, hardware requirements, especially in order to make further detailed description of the software, the proposed project scale for 2 units, electrical main wiring using generator – transformer group unit wiring, connected to 220kV / 500kV distribution system, The busbar for 6kV high voltage factory of main workshop adopts two working sections and special common sections.
4.1 Hardware Configuration Requirements
According to the traditional functional division, electrical into DCS monitoring, its function can be divided into data acquisition (DAS) and sequence control (SCS) two parts, compared with thermal volume due to the electric parameters and no special requirements, and the control function of the relative motion speed, high reliability by retaining dedicated electrical devices, so in principle of DCS hardware no special requirements. The
configuration requirements of the hardware is consistent with the thermal, and its functions are integrated into the functions of DCS. But based on historical reasons DCS is responsible for thermal personnel, and thermal personnel know little about the electrical control principle, in the design, debugging, production maintenance